Measure 1 1 2 inches down from the bottom of the nut and wrap that with masking tape as the amount of the j bolt to be left exposed above the concrete.
How to fasten sole plate to elevated floor.
Typically the board will m.
Hammer anchors into every hole ensuring that they are installed to the.
Carefully place the sill place in the correct position and insert the wedge anchors into each hole through the sill plate.
In order to prevent moisture wicking into the sill plate and consequent danger of mould mildew and rot it s better to lay a 12 wide sheet of 6 mil polyethylene vapour barrier between the concrete and wood sill plate then fasten sill plate to concrete with tapcon screws.
In this video i show you my technique for installing a bottom plate of wall to concrete floor for finishing a basement or garage use these time stamps to jum.
Install the rebar for the j bolts at 1 3 4.
Drill pilot holes through the bottom plate in the locations you are attaching it to the concrete making sure to penetrate the concrete slightly to mark the locations.
Setting the sill plate 1 position each 2 inch by 6 inch sill board one at a time on edge on top of the foundation wall touching the anchor bolts.
Attaching sill plates to continuous footings on the first try can be a challenge.
Drill pilot holes through the concrete using a drill bit the same size or slightly smaller than the nail diameter.
Trick for attaching sill plates to concrete footings.
Concrete is porous and will wick moisture to anything placed on top of it.
Bob vila explains how to install a sill plate or seal on top of a foundation wall.
A sill plate also known as a sole plate is the bottom horizontal member of a wall or building to which the vertical studs will be attached.
When building a new structure it is critical to securely fasten it to the foundation or slab with the use of a sill plate.
Most sill plates are made from lumber usually a 2x4 2x6 2x8 or 2x10.